The role of the Building Envelope team in this project is to assess whether alternate wood-based building envelope solutions developed by the Fire Team to meet the fire provisions of NBC 2010, also meet NBC Part 5 requirements relating to the protection of the building envelope from long term degradation due to uncontrolled heat, air, moisture and precipitation (HAMP) ingress into the building envelope of mid-rise buildings.
In a process of consultations with stakeholders, including the Canadian Wood Council (CWC), FPInnovations, and consultations with NRC’s Fire and Acoustics teams, specifications were developed for 2.44 m x 2.44 m wall specimens that would be investigated for hygrothermal performance.