The Task Group on Combustible Construction is in the process of evaluating a proposed code change request related to buildings of encapsulated mass timber construction (EMTC). As part of the analysis of the code change request, an impact analysis is required that includes a cost-benefit analysis.
Hanscomb was hired to provide a cost-benefit analysis and to compare the estimated value of the following:
1. The cost of constructing a building of mass timber (unprotected) versus a building constructed of encapsulated mass timber (e.g. mass timber protected with a double layer of Type X gypsum board) versus a traditional concrete and steel building.
2. The time to build a building of mass timber construction (unprotected) versus a building of encapsulated mass timber construction versus a traditional concrete and steel building.
3. The annual maintenance costs of building of mass timber construction versus a building of encapsulated mass timber construction versus a traditional concrete and steel building.
For the purposes of this study two sets of conceptual floor plans and elevations have been created:
1. A 12 storey building with a Group C major occupancy (residential) where each storey is 6,000 m2 in floor area.
2. A 12 storey building with a Group D major occupancy (office) where each storey is 7,200 m2 in floor area.