In Phase I of Developing Large Span Two Way CLT Floor System (2017-18) we studied the performance of a steel plate connection system for the minor direction of CLT plates. The connected specimens had higher stiffness and strength compared to intact members under bending. In Phase II (2018-19) we designed and tested another connector based on...
In Phase I (2018-19) of this project on Prefabricated Heavy Timber Modular Construction, three major types of connections used in a stackable modular building were studied: intramodule connection, inter-module vertical connection, and inter-module horizontal connection. The load requirement and major design criteria were identified...
The Softwood Lumber Board, Arup, MyTiCon and DR Johnson have partnered to complete three full-scale fire tests for glulam beam to column connectors. The fire tests have been completed for “off-the-shelf” connectors for glulam beams, testing the conne...