This project aims to support the construction of tall wood buildings by identifying encapsulation methods that provide adequate protection of mass timber elements; the intention is that these methods could potentially be applied to mass timber elements so that the overall assembly could achive a 2 h fire resistance rating.
This report addresses serviceability issues of tall wood buildings focusing on vibration and sound insulation performance. The sound insulation and vibration performance may not affect building's safety, but affects occupants' comfort and proper operation of the buildings and the funciton of sensitive equipment, consequently the acceptance of midrise and tall wood buildings in market place. Lack of data, knowledge and experience of sound and vibration performance of tall wood buildings is one of the issues related to design and construction of tall wood buildings.
Project contact is Thomas Miller at Oregon State University
Summary
Understanding how roof and floor systems (commonly called diaphragms by engineers) that are built from Pacific Northwest-sourced cross-laminated timber (CLT) panels perform in earthquake prone areas is a critical area of research. These building components are key to transferring normal and extreme event forces into walls and down to the foundation. The tests performed in this project will provide data on commonly used approaches to connecting CLT panels within a floor or roof space and the performance of associated screw fasteners. Structural engineers will directly benefit through improved modeling tools. A broader benefit may be increased confidence in the construction of taller wood buildings in communities at greater risk for earthquakes.
In response to the global drive towards sustainable construction, CLT has emerged as a competitive alternative to other construction materials. CLT buildings taller than 10-storeys and CLT buildings in regions of moderate to high seismicity would be subject to higher lateral loads due to wind and earthquakes than CLT buildings which have already been completed. The lack of structural design codes and limited literature regarding the performance of CLT buildings under lateral loading are barriers to the adoption of CLT for buildings which could experience high lateral loading. Previous research into the behaviour of CLT buildings under lateral loading has involved testing of building components. These studies have generally been limited to testing wall systems and connections which replicate configurations at ground floor storeys in buildings no taller than three storeys. Consequently, to develop the understanding of the performance of multi-storey CLT buildings under lateral loading, the performance of wall systems and connections which replicate conditions of those in above ground floor storeys in buildings taller than three storeys were experimentally investigated. The testing of typical CLT connections involved testing eighteen configurations under cyclic loading in shear and tension. The results of this experimental investigation highlighted the need for capacity-based design of CLT connections to prevent brittle failure. It was found that both hold down and angle bracket connections have strength and stiffness in shear and tension and by considering the strength of the connections in both directions, more economical design of CLT buildings could be achieved. The testing of CLT wall systems involved testing three CLT wall systems with identical configurations under monotonic lateral load and constant vertical load, with vertical loads replicating gravity loads at storeys within a 10-storey CLT building. The results show that vertical load has a significant influence on wall system behaviour; varying the vertical load was found to vary the contribution of deformation mechanisms to global behaviour within the elastic region, reinforcing the need to consider connection design at each individual storey. As there are still no structural design codes for CLT buildings, the accuracy of analytical methods presented within the literature for predicting the behaviour of CLT connections and wall systems under lateral loading was assessed. It was found that the analytical methods for both connections and wall systems are highly inaccurate and do not reflect experimentally observed behaviour.
The report describes a new structural system in wood that is the first significant challenger to concrete and steel structures since their inception in tall building design more than a century ago. The introduction of these ideas is fundamentally driven by the need to find safe, carbon-neutral and sustainable alternatives to the incumbent structural materials of the urban world. The market for these ideas is quite simply enormous. The proposed solutions have significant capacity to revolutionize the building industry to address the major challenges of climate change, urbanization, sustainable development and world housing needs.
In this project, CUrisk was employed to assess and compare the risk-to-life due to fire in mid-rise and high-rise residential and office buildings of wood construction and of non-combustible construction and to demonstrate how fire protection measures can be tuned to ensure a mid-rise or high-rise building of wood construction is as safe as a similar building of non-combustible construction.
The computation results show that [...] Comparisons between the numbers of deaths and injuries of scenarios with and without suitable fire protection systems show the importance of fire protection systems in reducing life risk from fire in all buildings. Sustaining the reliability of fire protection systems through proper design, installation, inspection, and maintenance is important to achieve the life safety objectives.
This article outlines the structural design approach used for the Brock Commons Student Residence project, an 18-storey wood building at the University of British Columbia in Vancouver, Canada. When completed in summer 2017, it will be the tallest mass timber hybrid building in the world at 53 meters high. Fast + Epp are the structural engineers, working in conjunction with Acton Ostry Architects and Hermann Kaufmann Architekten. Total project costs, inclusive of fees, permits etc. are $51.5M CAD.