Brock Commons Tallwood House, University of British Columbia: An Environmental Building Declaration According to EN 15978 Standard

https://research.thinkwood.com/en/permalink/catalogue2158
Year of Publication
2018
Topic
Environmental Impact
Material
CLT (Cross-Laminated Timber)
Glulam (Glue-Laminated Timber)
Application
Hybrid Building Systems

Structural Performance Monitoring Technology and Data Visualization Tools and Techniques – Featured Case Study: UBC Tallwood House

https://research.thinkwood.com/en/permalink/catalogue2342
Year of Publication
2018
Topic
Moisture
Serviceability
Material
CLT (Cross-Laminated Timber)
Glulam (Glue-Laminated Timber)
Application
Columns
Floors
Author
Mustapha, Gamal
Khondoker, Khaleed
Higgins, James
Year of Publication
2018
Country of Publication
Canada
Format
Conference Paper
Material
CLT (Cross-Laminated Timber)
Glulam (Glue-Laminated Timber)
Application
Columns
Floors
Topic
Moisture
Serviceability
Keywords
Moisture Performance
Vertical Movement
Prefabrication
Language
English
Conference
International Conference on New Horizons in Green Civil Engineering
Research Status
Complete
Summary
Wood structures such as the Wood Innovation and Design Center in Prince George and the UBC Tallwood House, an 18 storey, 53-meter-tall mass timber hybrid building are examples of new and innovative wood structures that encompass new construction techniques, unique materials and novel building practices. Empirical data on the condition of critical components and access to the real-time status of the structure during construction gives Architects, Engineers and Contractors critical information to make informed decisions to either validate or improve the construction plan. Data recorded during the life of the building helps validate the design decisions and proves the viability and feasibility of the design. Methods and practices used to monitor both the moisture performance of prefabricated cross laminate timber (CLT) as well as the vertical movement sensing of the building during and after construction are explored in this paper. Moisture content of the CLT panels has been recorded from manufacturing and prefabrication to storage, through transport and during installation and will continue throughout the service life of the building. The calculated and expected displacement of the wood columns is scheduled to take several years as the structure settles, however a first-year analysis and extrapolation of the data was conducted. Monitoring during transport, storage, and construction proved that CLT panels were resilient to moisture issues while in the manufacturers storage, but prone to direct exposure to moisture-related problems regardless of the precautions taken on site. Despite construction during typical Pacific Northwest rain, informed decisions were made to ensure the panel moisture content could decrease to acceptable ranges before continuing to secondary construction phases. The moisture trends observed in the building were proportional to the control samples as both were subjected to similar environmental conditions.
Online Access
Free
Resource Link
Less detail

Moisture Performance and Vertical Movement Monitoring of Pre-Fabricated Cross-Laminated Timber: UBC Tallwood House

https://research.thinkwood.com/en/permalink/catalogue2276
Topic
Moisture
Material
CLT (Cross-Laminated Timber)
Application
Wood Building Systems
Organization
Structure Monitoring Technology Ltd.
Country of Publication
Canada
Material
CLT (Cross-Laminated Timber)
Application
Wood Building Systems
Topic
Moisture
Keywords
Monitoring
Vertical Movement
Brock Commons
Research Status
In Progress
Notes
Project contact is Gamal Mustapha at SMT Research Ltd.
Summary
This monitoring project evaluates the life cycle moisture performance of prefabricated CLT from manufacturing to installation into an 18-storey tall wood building.
Less detail

Field Study of Hygrothermal Performance of Cross-Laminated Timber Wall Assemblies with Built-In Moisture

https://research.thinkwood.com/en/permalink/catalogue1588
Year of Publication
2013
Topic
Moisture
Serviceability
Material
CLT (Cross-Laminated Timber)
Application
Walls
Author
McClung, Victoria
Organization
Ryerson University
Year of Publication
2013
Country of Publication
Canada
Format
Thesis
Material
CLT (Cross-Laminated Timber)
Application
Walls
Topic
Moisture
Serviceability
Keywords
Hygrothermal
Drying
Wetting
North America
Language
English
Research Status
Complete
Summary
Cross-laminated timber (CLT) panels have potential market in North America for building mid-rise structures due to their good structural and seismic performance, lightweight, and prefabricated nature. However, to ensure long-term durability, the hygrothermal performance of CLT wall assemblies needs to be evaluated in terms of drying and wetting potential before their widespread adoption in North America. A test wall was constructed with initially wetted CLT panels, and monitored over a year. The drying behaviour of the panels was analysed, and results were compared to hygrothermal simulations. It was found from the field data that no tested wall assemblies in the given climate prevented the panels from drying in enough time to prevent decay initiation. The hygrothermal simulation program is capable of predicting general trends, and can predict if a wall be safe, but tends to be overly conservative. Further refinement of the model for wood is needed.
Online Access
Free
Resource Link
Less detail

Hygrothermal Performance of Cross-Laminated Timber Wall Assemblies with Built-In Moisture: Field Measurements and Simulations

https://research.thinkwood.com/en/permalink/catalogue273
Year of Publication
2014
Topic
Serviceability
Moisture
Material
CLT (Cross-Laminated Timber)
Application
Walls
Wood Building Systems
Author
McClung, Ruth
Ge, Hua
Straube, John
Wang, Jieying
Organization
Building and Environment
Publisher
ScienceDirect
Year of Publication
2014
Country of Publication
Netherlands
Format
Journal Article
Material
CLT (Cross-Laminated Timber)
Application
Walls
Wood Building Systems
Topic
Serviceability
Moisture
Keywords
Drying
Hygrothermal
Moisture Content
Language
English
Research Status
Complete
Series
Building and Environment
Summary
Cross-laminated timber (CLT) panels have potential market in North America for building mid-rise or even taller structures due to their good structural and fire safety performance, light weight, and prefabricated nature. However, to ensure long-term durability when used in building enclosures, the hygrothermal performance of CLT wall assemblies needs to be evaluated in terms of wetting and drying potential. A test wall consisting of sixteen 0.6 m by 0.6 m CLT panels made of five different wood species (or species groups) and four different wall assemblies was constructed. The CLT panels were initially wetted with the moisture content (MC) in the surface layers approaching or exceeding 30%, and monitored for MCs and temperatures at different depths over one year in a building envelope test facility located in Waterloo, Ontario. The drying behaviour of these panels was analysed and the measured MCs over time were compared to simulation results using a commercial hygrothermal program. This field study showed that most of the CLT panels dried to below 26% within one month except for CLT walls with a low-permeance interior membrane, which indicated that none of the CLT walls would likely remain at a high MC level long enough to initiate decay under the conditions tested. The simulation results generally agree well with the field data at MCs below 26%. However, it was found that the hygrothermal simulation program tended to overestimate the MC in the centre of the panels by up to 5e10%, and simulated MCs at locations deep into the CLT panels were not as responsive to changes in ambient conditions, as the measurements indicated for assemblies with high exterior permeance.
Online Access
Free
Resource Link
Less detail

Innovation in Hybrid Mass Timber High-Rise Construction: A Case Study of UBC’s Brock Commons Project

https://research.thinkwood.com/en/permalink/catalogue1273
Year of Publication
2017
Topic
General Information
Material
CLT (Cross-Laminated Timber)
Glulam (Glue-Laminated Timber)
PSL (Parallel Strand Lumber)
Application
Hybrid Building Systems
Author
Fallahi, Azadeh
Organization
University of British Columbia
Year of Publication
2017
Country of Publication
Canada
Format
Thesis
Material
CLT (Cross-Laminated Timber)
Glulam (Glue-Laminated Timber)
PSL (Parallel Strand Lumber)
Application
Hybrid Building Systems
Topic
General Information
Keywords
High-Rise
Construction
Design
Prefabrication
Project Coordination
Virtual Design and Construction
Language
English
Research Status
Complete
Summary
With the advocacy for sustainable construction on the rise, use of timber as the main building material is being championed in large-scale construction projects. While the advancement of engineered timber products is addressing some issues that previously limited the use of wood in high-rise construction, there are still challenges such as fire and weather safety, code compliance and negative public perceptions. One main gap in the available resources is the lack of a comprehensive and detailed case study of a high-rise project with wood as the main construction material to capture constraints and innovations necessary in creating success, which has formed the direction of this research. This thesis is focused on documenting a case study of the Brock Commons project, an 18 storey, hybrid timber-concrete residential high-rise located at the University of British Columbia, Vancouver campus, which is the tallest hybrid timber building in the world. The overall research objective was to identify and document the delivery of this innovative project, with a specific emphasis on the innovations necessary to make timber high-rise construction successful and the use of VDC tools in the design and pre-construction process. The case study documents the project context, the design process, the business and industry drivers, and the motivation for construction. Moreover, it investigates the motivations for all stakeholders, identifies the challenges and constraints, and captures the innovative solutions that were utilized to ensure project success. The case study also documents the innovative use of VDC to support prefabrication and overall project coordination. Specifically, it investigates the role of the VDC integrators in the project, the paths of communications with the different project team members, and the inputs and outputs of each phase of design and construction. This research identified lessons learned that can be applied to other construction projects where timber is the main structural component and a heavy use of VDC and pre-fabrication is required. Use of timber and innovative methods in construction have been consistently rising in the past decade, and this research aims to provide a starting point for future efforts in mass timber high-rise construction.
Online Access
Free
Resource Link
Less detail

Quality Control and Quality Assurance in Hybrid Mass Timber High-Rise Construction: A Case Study of the Brock Commons

https://research.thinkwood.com/en/permalink/catalogue1272
Year of Publication
2018
Topic
Site Construction Management
Material
CLT (Cross-Laminated Timber)
Glulam (Glue-Laminated Timber)
PSL (Parallel Strand Lumber)
Application
Hybrid Building Systems
Author
Calderon, Francisco
Organization
University of British Columbia
Year of Publication
2018
Country of Publication
Canada
Format
Thesis
Material
CLT (Cross-Laminated Timber)
Glulam (Glue-Laminated Timber)
PSL (Parallel Strand Lumber)
Application
Hybrid Building Systems
Topic
Site Construction Management
Keywords
Quality Control
Quality Assurance
Brock Commons
Reinforced Concrete
Concrete Core
Construction
Language
English
Research Status
Complete
Summary
Wood has seen a resurgence recently as a construction material driven by technological advances and a growing concern for the environment. Although an increasing amount of mass timber high-rises are being built all around the world, lack of information and outdated preconceptions are some of the obstacles that are keeping mass timber products from increasing their market share in high-rise construction. Academia and industry leaders must keep track of the progress that is being made and inform the general public as innovation and technological advances continue to take place. In this context, the University of British Columbia has recently completed the construction of the Brock Commons Tallwood House. This 18-story residence building employs two reinforced concrete cores and a mass timber structure composed of cross laminated timber panels, glued-laminated columns, and parallel strand lumber columns. With this, the building is currently the tallest wood building in the world and a testament to the suitability of engineered wood elements for high-rise construction. Aiming to address the lack of information surrounding mass timber high rise construction, this thesis documents the quality assurance (QA) and quality control (QC) practices that were put in place during the delivery of the building. The main objective of this research was to identify and present lessons learned from the application of these QA/QC practices. To do this, various QA/QC practices were identified and analyzed by reviewing the project specifications and other project documents, reviewing recognized industry standards, and interviewing various members of the project team. This study found a series of comprehensive and well-planned QA/QC practices that were put in place by the project team and that were appropriate to comply with the project requirements. This study concluded that most of these practices are replicable and advisable for future projects. The different QA/QC practices that were identified and the lessons learned from their application are presented in this thesis.
Online Access
Free
Resource Link
Less detail

Effects of Climate Change on the Moisture Performance of Tallwood Building Envelope

https://research.thinkwood.com/en/permalink/catalogue2771
Year of Publication
2021
Topic
Moisture
Material
CLT (Cross-Laminated Timber)
Application
Building Envelope
Walls
Author
Defo, Maurice
Lacasse, Michael
Publisher
MDPI
Year of Publication
2021
Format
Journal Article
Material
CLT (Cross-Laminated Timber)
Application
Building Envelope
Walls
Topic
Moisture
Keywords
Climate Change
Hygrothermal Simulations
Moisture Performance
Durability
Mold Growth Risk
Language
English
Research Status
Complete
Series
Buildings
Summary
The objective of this study was to assess the potential effects of climate change on the moisture performance and durability of massive timber walls on the basis of results derived from hygrothermal simulations. One-dimensional simulations were run using DELPHIN 5.9.4 for 31 consecutive years of the 15 realizations of the modeled historical (1986–2016) and future (2062–2092) climates of five cities located across Canada. For all cities, water penetration in the wall assembly was assumed to be 1% wind-driven rain, and the air changes per hour in the drainage cavity was assumed to be 10. The mold growth index on the outer layer of the cross-laminated timber panel was used to compare the moisture performance for the historical and future periods. The simulation results showed that the risk of mold growth would increase in all the cities considered. However, the relative change varied from city to city. In the cities of Ottawa, Calgary and Winnipeg, the relative change in the mold growth index was higher than in the cities of Vancouver and St. John’s. For Vancouver and St. John’s, and under the assumptions used for these simulations, the risk was already higher under the historical period. This means that the mass timber walls in these two cities could not withstand a water penetration rate of 1% wind-driven rain, as used in the simulations, with a drainage cavity of 19 mm and an air changes per hour value of 10. Additional wall designs will be explored in respect to the moisture performance, and the results of these studies will be reported in a future publication. View Full-Text
Online Access
Free
Resource Link
Less detail

Preliminary Assessment of Hygrothermal Performance of Cross-Laminated Timber Wall Assemblies Using Hygrothermal Models

https://research.thinkwood.com/en/permalink/catalogue2628
Year of Publication
2010
Topic
Moisture
Design and Systems
Serviceability
Material
CLT (Cross-Laminated Timber)
Light Frame (Lumber+Panels)
Application
Walls
Author
Wang, J.
Baldracchi, P.
Organization
FPInnovations
Year of Publication
2010
Country of Publication
Canada
Format
Report
Material
CLT (Cross-Laminated Timber)
Light Frame (Lumber+Panels)
Application
Walls
Topic
Moisture
Design and Systems
Serviceability
Keywords
Hygrothermal
Moisture Performance
Rainscreen
Language
English
Research Status
Complete
Summary
Preliminary simulation was carried out using hygIRC and WUFI, both 1-D hygrothermal models, to analyze moisture performance of rainscreened wood-frame walls and cross-laminated timber (CLT) walls for the climates in Vancouver and Calgary. The major results are as follows. In order to provide baseline knowledge, preliminary comparisons between hygIRC and WUFI were conducted to investigate the effects of climate data, wall orientations and rain intrusion on the performance of the rainscreened wood-frame walls based on Vancouver’s climate. hygIRC tended to produce almost constant moisture content (MC) of the plywood sheathing throughout a year but WUFI showed greater variations, particularly when the ventilation of the rainscreen cavity was neglected. Rainscreen cavity ventilation provided dramatic drying potentials for wall assemblies based on the WUFI simulation. hygIRC indicated that east-facing walls had the highest moisture load, but the differences between orientations seemed negligible in WUFI when the rainscreen cavity ventilation was taken into account. When 1% of wind-driven rain was simulated as an additional moisture load, hygIRC suggested that the rainscreen walls could not dry out in Vancouver, WUFI, however, indicated that they could dry to a safe MC level in the summer. The discrepancies in material property data between the two models and between different databases in WUFI (even for the same wood species) were found to be very large. In terms of wood sorption data, large differences existed at near-saturated RH levels. This is a result of using pressure-plate/membrane methods for measuring material equilibrium moisture content (EMC) under high RH conditions. The EMC of wood at near-100% RH conditions measured with these methods can be higher than 200%, suggesting wood in construction would decay without liquid water intrusion or severe vapour condensation. The pressure-plate/membrane methods also appeared to be highly species-dependent, and have higher EMC at a certain RH level for less permeable species, from which it is relatively difficult to remove water during the measurement. The hygrothermal simulation in this work suggested that such a species bias caused by testing methods could put impermeable species (most Canadian species) at a disadvantage to permeable species like southern pine during related durability design of building assemblies. In terms of using CLT for construction in Vancouver and Calgary, the WUFI simulations suggested that the use of less permeable materials such as EPS (expanded polystyrene insulation), XPS (extruded polystyrene insulation), self-adhered bituminous membrane and polyethylene in wall assemblies reduced the ability of the walls to dry. On the other hand, permeable assemblies such as those using relatively permeable insulation like semi-rigid mineral wool (rock wool) as exterior insulation, instead of less permeable exterior insulation materials, would help walls dry. The simulation also suggested that using CLT products with initially low MC would significantly reduce moisture-related risks, which indicated the importance of protecting CLT and avoiding wetting during transportation and construction. In addition, the simulation found that indoor relative humidity (RH) conditions generated by the indoor RH prediction models included in hygIRC and WUFI varied greatly under the same basic climate and building conditions. The intermediate method specified in ASHRAE Standard 160 P resulted in long periods of saturated RH conditions throughout a year for the Vancouver climate, which may not be representative of ordinary residential buildings in Vancouver. The simulation in this study is preliminary and exploratory. It would be arbitrary to recommend one model over the other based on this report or use the simulation results directly for CLT wall assembly design without consultation with building science specialists. However, this work revealed more opportunities for close collaborations between the wood science and the building science communities. More work should be carried out to develop appropriate testing methods and assemble material property data for hygrothermal simulation of wood-based building assemblies. Model improvement and field verification are also strongly recommended, particularly for new building systems such as CLT constructions.
Online Access
Free
Resource Link
Less detail

A Visual Assessment of Cross-Laminated Timber Structures in Austria

https://research.thinkwood.com/en/permalink/catalogue2693
Year of Publication
2020
Topic
Serviceability
Moisture
Material
CLT (Cross-Laminated Timber)
Application
Wood Building Systems
Author
Quesada-Pineda, Henry
Smith, Robert
Berger, Guenter
Loferski, Joseph
Year of Publication
2020
Format
Journal Article
Material
CLT (Cross-Laminated Timber)
Application
Wood Building Systems
Topic
Serviceability
Moisture
Keywords
Building Inspection
Wood Construction
Water Damage
Austria
Language
English
Research Status
Complete
Series
Bioproducts Business
Summary
Cross-laminated timber (CLT) construction systems have been used commercially for over 20 years, mainly in Western Europe and North America. However, there has not been a report on the current status of CLT buildings. Deterioration of wooden buildings could result from a variety of causes and the life of the structures could be extended if periodic inspections were conducted. This research introduces a visual inspection methodology for assessing deterioration of CLT structures. The inspection methodology was tested in six CLT buildings in Austria. The methodology was proven to be effective in determining the current internal and external condition of the examined CLT structures. The oldest CLT structure inspected dates from 2004. The newest structure inspected was still under construction. The results of the application of the visual inspecting tool show that there was very little damage to the CLT structures. The main causes of damage came from exposure to water on the exterior of the buildings and poor control of humidity and temperature in indoor conditions. Architects who designed the inspected buildings were interviewed to cross validate the results of the visual inspection methodology. In addition, the interviews provided important insights related to the design, construction, and current conditions of the buildings. Furthermore, the architects also provided information regarding the main barriers and drivers that affect CLT construction in Austria.
Online Access
Free
Resource Link
Less detail